How many wind turbines are currently proposed for the project?

The Environmental Impact Statement (EIS) submitted was for 70 turbines, however during the Response to Submissions assessment process we have committed to removing five turbines, reducing the number to 65. The reduction of these five turbines addressed concerns relating to biodiversity and visual impacts. Removal of two of the turbines has directly resulted in removing impact to two threatened bat species.

How many landholders are directly involved in the project?

  • 4 landholders with full turbines
  • 4 neighbours that receive benefit from turbines
  • 4 landholders along the transmission line
  • 14 transport consents
  • 8 landowners offered biodiversity stewardship sites

How many neighbouring landholders are involved in the project?

  • 10 neighbour agreements

What are the next steps in the development approval process?

ENGIE and Someva have now officially lodged its Response to Submissions to the NSW Department of Planning, Industry and Environment (DPIE).

This document addresses the public submissions received in response to our EIS. You can read ENGIE’s full Response to Submissions here.

The Department of Planning, Industry and Environment (DPIE) will assess the Response to Submissions to provide a recommendation to the Independent Planning Commission.

Will this project be sold again?

At the present time, ENGIE intends to build, own and operate all of its renewable energy assets.




Traffic and Transport


Heavy Vehicle Traffic

What is the preferred oversize, over mass (OSOM) transport route?

Our original EIS stated that 20% of OSOM and construction traffic would impact several streets in the Nundle area, including Gill Street, Innes Street, Jenkins Street, Happy Valley Road, Head of Peel Road and Crawney Road.

This route has been removed from the project. Morrisons Gap Road is the primary route option for all construction and OSOM traffic.

Will OSOM traffic impact Tamworth or Muswellbrook?

There will be no impact to Tamworth from OSOM movements. The original OSOM transport route through Tamworth has now been removed from the Development Application to avoid impacting communities and residents in this area.

We’re currently working with Muswellbrook Shire Council on route options for OSOM movements through Muswellbrook to ensure the least disruption to residents. We have a commitment to ensure all OSOM transport movements avoid school bus hours through Muswellbrook.

Local Traffic

What are the likely impacts to traffic through Nundle during construction?

Through discussions with the local community, we understand that residents are concerned about increased traffic, particularly during the construction period. In responding to these concerns we’ve made key changes to our traffic management plan, ensuring a 38% reduction in daily traffic movements through Nundle during the construction period, improving safety and convenience. Of these traffic movements, half will be construction staff in light vehicles such as utes, providing revenue into the local economy. Some of the key changes will look to utilise car-pooling schemes to reduce the number of vehicles driving to site each day, as well a proposed temporary project car park to reduce pressure on available parking within Nundle. We will also install an additional pedestrian crossing in Nundle (subject to TRC approval) and employ parking restrictions in the town for project vehicles. We also have a commitment to ensure all OSOM transport movements avoid school bus hours through the town.

Head of Peel Road has also been removed as a project site access route. This will mean there will be less OSOM movements through the residential areas of Nundle.

It is important to note that existing logging trucks create around 70 heavy vehicle movements one-way per day through Nundle, and the additional impact to traffic as a result of the HOGWF’s OSOM movements from the New England Highway to the project site is not significant.

What are the likely impacts to residents on Barry Road and Morrisons Gap Road during construction?

ENGIE is committed to roads safety, particularly to residents directly affected along access routes. We are undertaking further civil design to the upgrades required on Barry Road and Morrisons Gap Road to provide increased certainty for property owners. Currently, upgrades to Morrisons Gap Road include widening to 5.5 metres and adding laybys. The road will also be sealed once the construction phase is complete. Ongoing surveys are being undertaken for OSOM transport movements and the refinement of swept path.

During project construction we will be utilising vehicle escorts, call-up protocols to residents along Morrisons Gap Road, and installing in-vehicle monitoring systems for regular vehicles accessing the project site.

We will also ensure there are no OSOM transport movements during school bus hours.




Project design and Biodiversity impact


Native Vegetation

How will native vegetation (including Koala and Wombat habitat) around the project site be impacted?

We share the community’s concern about impacts to native vegetation and habitats of native wildlife and have engaged industry leading consultants to conduct biodiversity studies. Studies conducted over two years confirmed there will be no serious or irreversible biodiversity impacts from the Project.

Given concerns raised in public submissions, we’ve undertaken further biodiversity studies in 2021 and subsequently made key changes to our development application, such as removing the Head of Peel Road as an access route and realigning transmission lines. These changes have reduced the total development footprint by 41%, prevented nine waterway crossings from being impacted, and reduced the removal of high-condition native vegetation by 45%. There will also be a 17% reduction in the removal of threatened native species habitat, which will result in a 29% reduction in the removal of koala habitat to 36ha.

It is worth noting that only two koalas were spotted during the extensive surveys carried out between 2018 and 2020, and that despite significant loss of habitat during the 2019/20 bushfires, there remains suitable habitat in neighbouring properties and over 3000ha in nearby nature reserves.

We have committed to a spotting and handling program to ensure any animals found prior to and during construction are relocated to high condition habitat in adjoining properties.

In addition, we are progressing with developing biodiversity stewardship sites, which will create wildlife corridors between existing National Parks.

All mitigation measures to protect biodiversity and native animals will be governed by environmental management plans that must be prepared and implemented by specialists, and approved by DPIE, should the project receive development approval.

What impact will the development have on native bats and their habitat?

Following further surveys and assessment of bat-roosting habitat, we have an increased understanding of the presence of bats on site. Through additional design work and the removal of wind turbines 19 and 23 we have reduced the number of wind turbines within bat-roosting habitat buffers from nine to two. We have also been undertaking further geomorphological assessment of caves and karsts to confirm their location in relation to the project site. We have also further increased bat habitat mapping, which has resulted in refined identification of roosting habitat.

We are progressing with developing biodiversity stewardship sites, which will create wildlife corridors between existing National Parks.

All mitigation measures to protect biodiversity and native animals will be governed by environmental management plans that must be prepared and implemented by specialists, and approved by DPIE, should the project receive development approval.

Water

How will the Peel catchment and Tamworth’s water supply be impacted?

We assessed the project’s impact on Peel Valley Catchment in our original Soils and Water Assessment, as part of our EIS. However, we are now currently undertaking further investigations. The details of our latest study of impacts on the Peel Valley Catchment will be available in an updated Soils and Water Assessment Report in our Response to Submissions, however it is important to note Water NSW’s response to the EIS raised no concerns about impact to the catchment.

Will the wind farm impact on local springs in the areas?

It is likely that springs will be intersected during the construction period, as this is common in infrastructure projects. Suitable mitigation measures will be implemented if and when this occurs.

To ensure that flows from the up-gradient catchment, including rainfall runoff or any identified springs, reach down-gradient watercourses and the Peel River, options including drainage rock blankets installed for seepage and culverts installed at key watercourse crossing points will be confirmed at the detailed design phase.

What water supply will be used during construction of the wind farm?

It is estimated that around 55ML of water will be required during the two-year construction phase of the wind farm. This water will be used to facilitate the construction of access tracks, concrete foundations, dust suppression and cleaning of the wind turbine components before erection.

There currently are four viable options available to source that water, including:

  • Council water supply, with agreement from Council
  • Extraction from a nearby existing landowner bore, with agreement from landowner
  • Extraction from a new groundwater bore (once approval is sought)
  • Extraction from a surface water source (Peel River)

The options will be reviewed by DPIE, with the project contractor then determining the best source based on the approved options.




Community and Heritage


How will the community be compensated?

ENGIE is committed to supporting the local communities that host our projects. In response to feedback received by the local councils, we are committed to allocating $3,000 per wind turbine per year during operations to the Community Enhancement Fund (CEF) for Tamworth Regional Council and Upper Hunter Shire Council (funding shared between councils based on which Local Government Area wind turbines are located).

While there has been a reduction in the number of wind turbines, from 70 to 65, at this point in time, the annual fund contribution will be based on 70 turbines. If further changes are made to the project layout or total number of turbines, then ENGIE will re-assess its annual contribution to the CEF.

In addition, we are also committing a one-off sponsorship fund of $150,000 to support community initiatives during construction, which will be administered by the Project. The Project will also be making additional commitments, including pedestrian crossings within Nundle (subject to TRC approval), traffic reduction schemes, implementation of voluntary speed limits and the provision of an Information Hub within Nundle for Project updates.

How can the community be involved in the decision making of the Community Enhancement Fund?

A CEF Committee will be formulated that will have local Council representation, voluntary community members and an independent Chair. The way the funds will be disseminated within the community will be established once the committee has been formulated.

How will ENGIE ensure the constructions sponsorship fund of $150,000 goes to the local community?

ENGIE is committed to working within the local townships of Nundle and Hanging Rock during construction to ensure that impact is minimised as much as possible. The purpose of the construction sponsorship fund is to provide benefit to the local community that would be advantageous to both individuals and groups within the area. This may include sports sponsorships, community gardens, enhancement to local areas, scholarships, and local community events. We would welcome any suggestions that the community may have to assist with identifying opportunities.

Local Heritage

What impact will the proposed bypass of Devil’s Elbow have on surrounding heritage sites?

We understand that the mining heritage of the town is important to residents. Following community input, we are currently working to ensure our proposed bypass to Devil’s Elbow will have minimal impact on nearby heritage sites, like the Black Snake Mine. We have recently undertaken geo-physical investigations to gain a greater understanding on the potential mine shafts in the area and are engaging a construction contractor to undertake a 50% concept design. These investigations and civil design works will assist us to avoid heritage values in the area.




Local Economy, Business and Tourism


What are the economic benefits of the project?

ENGIE’s Hills of Gold project will bring a number of economic benefits to the region. During the construction phase there will be 211 direct jobs and 404 indirect jobs. Once operational, the wind farm will provide 16 local jobs, as well as opportunities to develop new skills in the region within the growing renewable energy industry.

The construction and operation of the wind farm will require a range of skills including engineering, trades (electrical, mechanical, construction), transport, building material providers, equipment operators, consultants and administrative staff. ENGIE will encourage all contractors to employ local people where possible. Through the upgrade of local roads and waterway crossings, during the construction and operational life of the project, there will be investment and financial contributions of $104 million, through wages and profit to local communities and services.

Will the wind farm reduce the value of the land in Nundle?

A number of studies have been undertaken both within Australia and overseas, into the impact of wind farms on nearby property values.

In 2016, the NSW Office of Environment and Heritage commissioned a report into the impact of wind farms on property values. The report concluded that across the case studies reviewed in NSW and VIC, there was no evidence of negative impacts on property values. Furthermore, the resale values of all the properties examined in the report experienced capital growth in line with the property market trends. A full copy of the report is available here.

In another study completed in 2013, national property consultants Preston Rowe Paterson conducted an assessment of the impact of wind farms on surrounding land values in Australia, and similarly concluded that there was no ‘quantifiable effect on land values’. The full report can be found here.

It is important to note many factors influence land and property prices. Supply and demand, proximity to amenities and infrastructure, housing affordability and the desirability of the location can all have an impact.

What benefits will there be for local businesses?

During the construction phase of the project, it is envisaged that a number of local businesses will experience an increase in sales as the onsite workforce purchase everyday items such as food, drinks, petrol and other groceries. There will also be a demand for increased accommodation in the area. This will include long term accommodation requirements particularly during the two-year construction period.

Once the transition to operation occurs, the onsite workforce of up to 28 people may provide a modest boost to ongoing sales of these grocery items.

Local community benefits can include:

  • Boost to the local and regional economy and local businesses

  • Jobs during construction and operation

  • Training, skills development and education programs

  • Community Enhancement Fund

What sort of workers or suppliers will be needed and how can I register my business?

We expect a number of skills and suppliers to be required by our main contractor during the construction phase of the project which include:

Skills

  • Earthworks plant operator

  • Labourers

  • Mechanical and electrical engineers/fitters

  • Cementers and grouters

  • Building contractors

  • Heavy vehicle truck drivers

  • Heavy machinery operators

  • Pipelayers

  • Welding and engineering

Suppliers
  • Mechanics and maintenance
  • Cleaners
  • Accommodation
  • Catering services
  • Equipment hire
  • Fencers
  • Freight
  • Waste management
  • Administration
If you’re interested in finding out more about future employment opportunities, please register your interest on our website.

How was the business survey conducted and what were the key results?

ENGIE undertook a survey in August 2021 to gauge project sentiment amongst business owners who will have a direct impact from traffic movements associated with the project. The survey was sent to known businesses with a shopfront or that are home-based in both Nundle and Hanging Rock. The survey was also used to gain feedback on a number of proposed traffic management strategies.

A total of 55 responses were received showing that 67% of local business owners with a shopfront are in favour of the Project. Of those that support the project, more than 90 per cent believe the Project will bring economic benefits to their business, with majority citing increased revenue and increased customers as the biggest benefits.

In addition, 75 per cent of the supportive business owners believe ENGIE’s project will strengthen the region’s existing tourism market.

Will Nundle tourism be impacted by the project?

The Nundle region is already a popular tourist destination, reliant on the area’s rich gold mining history and natural beauty. Our aim is to ensure that the HOGWF can co-exist with and complement the existing heritage and natural elements of the Nundle region.

As part of further investigations into the proposed development’s impact on tourism, the University of Newcastle was engaged to compile a report on wind energy and tourism.

The desktop study looked into the benefits and opportunities of wind farm tourism, concluding that ‘there is very little academic evidence that the presence of wind farms has a significant negative economic impact on the tourism industry in rural localities’ (Dr Barrie Shannon, 2021).

It also stated that ‘adventure tourism, eco-tourism and educational tourism incorporating wind farm infrastructure are emerging globally as key opportunities for rural localities’ (Dr Barrie Shannon, 2021).

You can ready the report in full on our website.

We believe the HOGWF will boost local tourism and bring additional visitors to the area by appealing to different markets. There are several examples of wind farm tourism in Australia and around the world, with many wind farms listed as tourist destinations in their own right.

There are many benefits to businesses located near windfarms, including using turbines in advertising and imagery. There are also several wind farms that host bus tours for visitors and school groups, which is something that will be considered for the HOGWF.